Experts in onsite spraying throughout the UK

Over 25 years in business

Quote request

Our expert team will respond to all requests as quickly as possible.

Enquiry form

We want to make the quotation process as easy as possible, but also want to ensure that we provide an accurate cost for your project.

Please complete the enquiry form, providing as much detail as possible and we will get back to you very soon.

Please note that we are experts in commercial spraying and do not work on residential projects.

How can we help you?

What service do you need?
What sort of property needs spraying?
Can you provide more information about the site?

Fire protection enquiry

If you already have all the information needed to request a full intumescent fire protection quote, please send this through to us by clicking on the intumescent quote button.

Find out what information is required here >> 

The Sprayzone process

1. Initial review

Submit your project requirements on this page, and an expert consultant will review the information that you provide. The more information you provide, the more quickly we can provide you with a quote. This should include if possible; full site address (including postcode), details of what you would like to be sprayed, measures, plans (if you have them), photos and details of any potential access issues.

2. Comprehensive site survey

Where possible we will provide quotes from the information you provide so that we can issue a quote to you as quickly as possible.  However, where required, we provide a free, no-obligation on-site physical survey to accurately quantify substrate conditions, safe access requirements, and scope metrics.

3. Comprehensive Written Quotation

You will receive a transparent technical quotation outlining exact coating specifications, project shift durations, lead times, and available warranty terms.

4. Professional delivery

Our experienced sprayers will complete the transformation of your building using professional spraying equipment, and to the agreed schedule.  The team will work out of hours if necessary, to ensure continuity of your daily operations.

Talk to our expert team

Discuss your next project and receive a free, no-obligation site survey.

Request Intumescent quote

Contact details

Required information

Please attach here a schedule of the steel sizes and structural drawings from your structural engineer. These are required in order to calculate the quantities and loadings to achieve the required fire rating. We are unable to provide a quote without these.
Fire protection duration
Specify the required fire protection duration

Useful information

The following information is useful so that we can provide an accurate quote but is not required at this stage. If you do not have this info ready, please click on next and then submit the form at the end.

If you do not have the information to hand we will contact you with any questions that we have. You can see the list of useful information here.
Paint specification
If a particular paint manufacturer or product has been specified please let us know.
Environment
Ideally all steels will be located in a dry internal environment. Alternatively let us know if you will be providing fully sheeted scaffold to access external faces of steel.
Masking
Initial quotations will not include masking if not selected here. This is usually only required if adjacent surfaces are to be left exposed in the completed project.
Preparation
On new build projects the steels will typically arrive on site pre-primed and little preparation is required. Existing steels that have been either previously painted or are exhibiting rust will require extensive preparation. Please select the option you think is most likely to be the case.
Primer
This is typically applied prior to the steels arriving on site but we will need to know what primer has been used. If you know what primer has been used please let us know here and include a datasheet if you have one. Alternatively, galvanised steel will require primer so please let us know if this is the case.
Access
We don’t typically include for access at the initial quote stage as the site conditions are unknown (particularly if the building has not yet been built). If we are requested to include for access, this is typically for the internal surfaces and we would need to know the maximum height and whether the concrete floors have been installed. If the floors have been installed, we can either work from scissor lifts or mobile scaffold towers.
Building use
Please let us know what the end use of the building will be. This ensures that we can specify the correct paint system.
Topcoat
There are 2 main reasons that require a topcoat: to provide a decorative finish in a specific colour reference or to provide a protective coating to better withstand moisture. If you know that either of these are required, please let us know.
Finish
If your finish has been specified please let us know here.
Attachments
If you wish to attach fixings to the steelwork after the intumescent has been applied these will also require coating. Do you have any attachments that will require coating?

Useful information

Please note that our quotes cannot include items such as masking, access equipment, application of primer, application of topseal unless we have been given all possible information. We are happy to quote based on the structural steel sizes and drawings but there will be additional costs for these items should they be required. If you are able to provide all of this information we will be able to provide a more accurate quotation.
Acceptance
I understand that the information provided in this form will be used to provide me with a quote. Should further information be required I consent to being contacted by Sprayzone.