Skip to content
Linkedin
Facebook-f
Twitter
Youtube
023 8070 4238
sales@sprayzone.co.uk
Home
About us
Our team
Case studies
Accreditations
Sustainability
Coatings
Price Promise Guarantee
Careers
Services
On Site Spraying
Ceiling Spraying
Cladding Spraying
Shopfront Spraying
Window spraying
Metal Roof Spraying
Curtain Wall Spraying
Intumescent Paint Spraying
News
Contact
Home
About us
Our team
Case studies
Accreditations
Sustainability
Coatings
Price Promise Guarantee
Careers
Services
On Site Spraying
Ceiling Spraying
Cladding Spraying
Shopfront Spraying
Window spraying
Metal Roof Spraying
Curtain Wall Spraying
Intumescent Paint Spraying
News
Contact
get your free quote
Intumescent form
Request intumescent quote
Request Intumescent quote
Contact details
Name
Company
Site address
Phone number
Email
Required information
Structural steel sizes
Attach structural steel drawings
Fire protection duration
Specify the required fire protection duration
Fire protection duration required
Please select your required fire protection duration
30 minutes
60 minutes
90 minutes
120 minutes
Useful information
The following information is useful so that we can provide an accurate quote but is not required at this stage. If you do not have this info ready, please click on next and then submit the form at the end.
If you do not have the information to hand we will contact you with any questions that we have. You can see the list of useful information
here
.
Paint specification
If a particular paint manufacturer or product has been specified please let us know.
Paint specification
Environment
Ideally all steels will be located in a dry internal environment. Alternatively let us know if you will be providing fully sheeted scaffold to access external faces of steel.
Environment
Internal environment
Fully sheeted scaffolding for external faces
External
Masking
Initial quotations will not include masking if not selected here. This is usually only required if adjacent surfaces are to be left exposed in the completed project.
Masking
Masking required
Masking not required
Unknown
Preparation
On new build projects the steels will typically arrive on site pre-primed and little preparation is required. Existing steels that have been either previously painted or are exhibiting rust will require extensive preparation. Please select the option you think is most likely to be the case.
Preparation required
Little preparation required (i.e. new steels)
Some preparation required
Extensive preparation required (i.e. previous paint needs removing, rusting steels)
Unknown
Primer
This is typically applied prior to the steels arriving on site but we will need to know what primer has been used. If you know what primer has been used please let us know here and include a datasheet if you have one. Alternatively, galvanised steel will require primer so please let us know if this is the case.
Primer
Primer datasheet
Access
We don’t typically include for access at the initial quote stage as the site conditions are unknown (particularly if the building has not yet been built). If we are requested to include for access, this is typically for the internal surfaces and we would need to know the maximum height and whether the concrete floors have been installed. If the floors have been installed, we can either work from scissor lifts or mobile scaffold towers.
Access information
Building use
Please let us know what the end use of the building will be. This ensures that we can specify the correct paint system.
Building use
Topcoat
There are 2 main reasons that require a topcoat: to provide a decorative finish in a specific colour reference or to provide a protective coating to better withstand moisture. If you know that either of these are required, please let us know.
Topcoat requirements
Finish
If your finish has been specified please let us know here.
Finish
Basic finish (reasonably smooth and even. Orange peel, other texture, minor runs and similar minor defects are acceptable.)
Normal decorative finish (good standard of cosmetic finish generally, when viewed from a distance of 5 m or more. Minor orange peel or other texture is acceptable. )
High decorative finish (high standard of evenness, smoothness and gloss when viewed from a distance of 2 m or more.)
Not specified
Attachments
If you wish to attach fixings to the steelwork after the intumescent has been applied these will also require coating. Do you have any attachments that will require coating?
Attachments
Yes
No
Unknown
Useful information
Please note that our quotes cannot include items such as masking, access equipment, application of primer, application of topseal unless we have been given all possible information. We are happy to quote based on the structural steel sizes and drawings but there will be additional costs for these items should they be required. If you are able to provide all of this information we will be able to provide a more accurate quotation.
Acceptance
I understand that the information provided in this form will be used to provide me with a quote. Should further information be required I consent to being contacted by Sprayzone.
Acceptance
I agree to the website privacy policy.
Request quote